| Zona horaria: | hora estándar de Australia oriental |
|---|---|
| Hora local: | miércoles, 16 de septiembre de 2026 9:44 |
| Longitud: | 151.3619443 |
| Latitud: | -32.8385219 |
| Amanecer hoy: | 5:54:31 |
| Atardecer hoy: | 17:47:38 |
| Horas de luz hoy: | 11h 53m 7s |
| Amanecer mañana: | 5:53:09 |
| Atardecer mañana: | 17:48:16 |
| Horas de luz mañana: | 11h 55m 7s |
: Mostrar todas las fechas
| Fecha | Salida de sol | Puesta de sol | Duración del día |
|---|---|---|---|
| 1 de ene. de 2026 | 5:50:43 | 20:07:12 | 14h 16m 29s |
| 1 de feb. de 2026 | 6:18:46 | 19:59:48 | 13h 41m 1s |
| 1 de mar. de 2026 | 6:44:11 | 19:32:49 | 12h 48m 37s |
| 1 de abr. de 2026 | 7:06:57 | 18:52:34 | 11h 45m 36s |
| 1 de may. de 2026 | 6:28:19 | 17:17:31 | 10h 49m 11s |
| 1 de jun. de 2026 | 6:49:43 | 16:57:47 | 10h 8m 4s |
| 1 de jul. de 2026 | 6:59:00 | 16:59:50 | 10h 0m 49s |
| 1 de ago. de 2026 | 6:46:46 | 17:17:30 | 10h 30m 44s |
| 1 de sep. de 2026 | 6:14:23 | 17:38:13 | 11h 23m 49s |
| 16 de sep. de 2026 | 5:54:31 | 17:47:38 | 11h 53m 7s |
| 17 de sep. de 2026 | 5:53:09 | 17:48:16 | 11h 55m 7s |
| 1 de oct. de 2026 | 5:34:02 | 17:57:17 | 12h 23m 14s |
| 1 de nov. de 2026 | 5:57:31 | 19:21:15 | 13h 23m 43s |
| 1 de dic. de 2026 | 5:40:51 | 19:48:49 | 14h 7m 58s |
Fotos de amanecer y atardecer

SMR 31 and 30 approach the Neath Junction signal box, on one of the last steam hauled trains bound for the Pelton Washery.Pelton. South Maitland Railways. Hunter Valley, NSW, 7th June, 1983. by garratt3

SMR30 and the Neath Junction signal man exchange staffs as the train leaves the Neath Colliery Branch for the Main Line. South Maitland Railways, NSW, January, 1979. by garratt3

SMR22 crests Denman Hill, Abermain. August, 1979, South Maitland Railway, Hunter Valley, NSW. by garratt3

SMR22 and SMR10 cross Swamp Creek, and are starting the climb towards Bee Siding. South Maitland Railways, Hunter Valley, NSW, July, 1979. by garratt3

SMR22 and SMR18 haul a rake of Non-Air Hoppers up Neath Bank, South Maitland Railways, Hunter Valley, NSW, September, 1977. by garratt3

SMR22 and SMR10 are crossing Swamp Creek, to start the climb towards Bee Siding. South Maitland Railways, Hunter Valley, NSW, July, 1979. by garratt3

An SMR 10 Class ascends Neath Bank on the way to Aberdare. South Maitland Railways, Hunter Valley, NSW, July, 1979. by garratt3

SMR22 and SMR10 are about to cross Swamp Creek, then start the climb towards Bee Siding. South Maitland Railways, Hunter Valley, NSW, July, 1979. by garratt3

Two SMR 10 Class get a run at Neath Bank, South Maitland Railways, Hunter Valley, NSW, September, 1976. by garratt3

In the last week of steam operation on the SMR, two 10 Class approach Weston, on the way to Pelton. South Maitland Railways, NSW, June, 1983. by garratt3

SMR 31 and 30 approach the Neath Junction signal box, on one of the last steam hauled trains bound for the Pelton Washery.Pelton. South Maitland Railways. Hunter Valley, NSW, 7th June, 1983. by garratt3

SMR10 and SMR22 run across Swamp Creek before tackling the climb up to Loxford. South Maitland Railways, NSW, 3rd June, 1983. by garratt3

SMR23 and SMR10 charge past the yard crane, Weston. South Maitland Railways, NSW, 4th June, 1983. by garratt3

SMR31 and SMR22 leave Pelton, crossing Wolllombi Road road on an ARHS tour. South Maitland Railways, Hunter Valley, NSW. 24th April, 1983. by garratt3

SMR31 approaches Neath Junction, South Maitland Railways, Hunter Valley, NSW. July, 1979. by garratt3

SMR30 shunting at Aberdare Washery, South Maitland Railways, Hunter Valley, NSW. August, 1979. by garratt3

SMR22 and SMR31 enter Bellbird Cutting. South Maitland Railways, Hunter Valley, NSW. 24th April, 1983. by garratt3










































